Dewatered Construction of a Braced Excavation

Software

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Servicios de consultoría

A braced excavation is constructed in saturated ground. The construction stages, dewatering, excavation and braced support construction are simulated with FLAC. The purpose is to evaluate the deformation of the ground adjacent to the excavation and the performance of the wall and strut support. Three different material constitutive models are used to represent the soil behavior: Mohr-Coulomb, Cysoil, and PH models. The deformational response produced by these three models are compared.

Keywords:

  • Braced excavation
  • Saturated soil
  • Horizontal struts
  • Diaphram wall
  • support
  • Dewatering
  • Mohr-Coulomb model
  • Cysoil model
  • PH model
  • Plastic
  • Hardening
  • Construction sequence
  • Excavation
  • Settlement

Materials:

  • Clay
  • Sand
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Últimas noticias
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
    Leer mas
  • Primer Anuncio 6º Simposio Itasca sobre Modelado Numérico Aplicado se llevará a cabo del 3 al 6...
    Leer mas
  • 6th Itasca Symposium on Applied Numerical Modeling The next Itasca Symposium will take place June 3 - 6, 2024, in Toronto, Canada....
    Leer mas

Próximos Eventos
26 ago.
FLAC3D V9.1 and Griddle V2.0 2024
... Leer mas