Dewatered Construction of a Braced Excavation

Software

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services

A braced excavation is constructed in saturated ground. The construction stages, dewatering, excavation and braced support construction are simulated with FLAC. The purpose is to evaluate the deformation of the ground adjacent to the excavation and the performance of the wall and strut support. Three different material constitutive models are used to represent the soil behavior: Mohr-Coulomb, Cysoil, and PH models. The deformational response produced by these three models are compared.

Keywords:

  • Braced excavation
  • Saturated soil
  • Horizontal struts
  • Diaphram wall
  • support
  • Dewatering
  • Mohr-Coulomb model
  • Cysoil model
  • PH model
  • Plastic
  • Hardening
  • Construction sequence
  • Excavation
  • Settlement

Materials:

  • Clay
  • Sand
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • ITASCA Strengthens North American Delivery of Integrated Geomechanics and Hydrogeology Solutions Drawing on decades of geomechanical and hydrogeological expertise, ITASCA has announced the formation of ITASCA...
    Read More
  • WEBINAR: Solving Geothermal Challenges with XSite Numerical Modeling ITASCA Software and Baker Hughes are hosting a collaborative webinar to demonstrate how combining advanced...
    Read More
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
    Read More

Upcoming Events
8 Nov
ITASCA to Attend Tailings & Mine Waste 2026
This November, ITASCA will participate in Tailings & Mine Waste 2026 (TMW 2026), taking place from 8–11 November 2026 in Westminste... Read More
17 Nov
Visit ITASCA at Ground Support 2026
ITASCA will be participating in Ground Support 2026, the conference dedicated to ground support in mining and civil engineering, taking... Read More